download
Environmental Impact Assessment for the Construction and Operation of a 3.728 MW Photovoltaic Station by "SONTSE BETA PV LTD" in the Maroni community in the province of Larnaca
"SONTSE BETA PV LTD" a company specializing in the development of renewable energy sources, presents the results of an environmental impact assessment for the construction and operation of a 3.728 MW photovoltaic station in the Maroni community in the province of Larnaca.
In accordance with the regulations outlined in the 2018 Law on the Assessment of the Impact of Certain Projects on the Environment, "SONTSE BETA PV LTD " decided to conduct an impact assessment of the construction and future operation of the photovoltaic station while adhering to legal requirements and standards.
The location of the photovoltaic station is situated within the Maroni community, in the province of Limassol. It is planned that the project will be constructed and operational by december 2024. The comprehensive study aimed to determine the potential positive and negative impacts of the project on the environment, public health, and the well-being of the community.
The study results indicate that the planned construction and operational activities of the photovoltaic station will result in minimal and manageable negative impacts on the environment. It is hoped that the project will significantly reduce dependence on traditional energy sources and greenhouse gas emissions. "SONTSE BETA PV LTD" is committed to taking all necessary measures to limit and mitigate potential negative environmental impacts.